Basketball Court Construction
Get the thrill of basketball in your own backyard! Precision Courts offers extensive layout options for residential basketball courts and of course, custom basketball courts designed and envisioned by you!
We offer Basketball court layouts according to the American Sport Builders Association (ASBA), the International Basketball Federation (FIBA), National Basketball Association (NBA), National Collegiate Athletic Association (NCAA), National Federation of State High School Associations (NFHS), and the Junior Basketball Association (JBA). We first begin by knowing our customer’s plan about their vision of their future court. Where do they envision their courts? What are the surroundings of the court? What features do they want in the court? How often will they play in the court? The answers and descriptions to these questions are vital, so that we can give our customer the best advice for their court based on our experience.
- The area where the court will be built is marked
- The first sub-grade is graded and leveled
- The court is formed to prepare for the concrete pour
- An ABC Foundation is poured over the first sub-grade, is then graded, leveled, and compacted
- Vapor barrier is applied over the graded and compacted ABC sub-grade
- Post-Tension/Rebar (Most cases Post-Tension and preferably Post-Tension) is put down in the concrete slab area according to dimensions of the slab construction
- Level stakes are set within court to control court's slope
- Court is poured, leveled, and finished
- Slab is covered wit vapor barrier over it's surface to allow for curing
- Court vapor barrier is removed
- Concrete forms are removed
- Court is left to continue to cure and strengthen until the minimum 28-day full concrete strengthening time period
- Court is flood checked to look for any possible low/high spots and repaired if there are any imperfections on the slab's surface
- Basketball Hoop system is installed
- Fence posts and light posts are installed
- Chainlink fabric is installed
- Lightheads are installed
- Court is prepped for surfacing, then surfaced (painted)
- The court is complete!